STUDY ON THE DEVELOPMENT OF 35,000 MW POWER PLANTIN INDONESIA, 2015-2019 (インドネシアの35,000 MW発電所開発、2015-2019)
調査資料詳細データ
PT.CITRA CENDEKIA INDONESIA
「『YRIマーケットレポート等販売規約』の第7条(著作権について)の著作権者は当社ではなく、本レポートの発行会社に読み替えて適用します。」
本資料は、発送までに2週間程度お時間をいただきます。
I. INTRODUCTION
1.1. BACKGROUNDS
1.2. PURPOSE AND OBJECTIVES
1.3. SOURCE OF DATA
II. NEW ENERGY AND RENEWABLE
2.1. NEW ENERGY AND RENEWABLE
2.2. GEOTHERMAL
2.3. WATER POWER PLANT
2.4. MICROHIDRO POWER PLANT (PLTM/MH)
2.5. SOLAR POWER PLANT (PLTS)
2.6. BIOMASS
2.7. WIND POWER PLANT (PLT B)
2.8. MARINE ENERGY
2.9. COAL BED METHANE (CBM)
2.10. COAL SLURRY
2.11. NUCLEAR
III. AVAILABILITY OF POWER PREMIER
3.1. COAL
3.2. NATURAL GAS
3.2.1. Muara Karang and Priok
3.2.2. Muara Tawar
3.2.3. Tambak Lorok
3.3. LNG AND SMALL-LNG
3.4. CNG (COMPRESSED NATURAL GAS
3.5. FUEL MIX INDONESIA
3.5.1. Sumatera Fuel Mix Goal
3.5.2. Jawa-Bali Fuel Mix Goal
3.5.3. Eastern Indonesia Fuel Mix Goal
IV. ELECTRICITY CONDITION IN INDONESIA
4.1. SALES OF ELECTRIC POWER
4.1.1. Amount of Customers
4.1.2. Electrification Ratio
4.1.3. Electriced Village Ratio
4.1.4. Peak Load Growth
4.2. POWER PLANT SYSTEM CONDITION
4.2.1. Sumatera Region
4.2.2. Jawa-Bali Region
4.2.3. Eastern Indonesia Region
4.3. TRANSMISSION SYSTEM CONDITION
4.3.1. Sumatera Region Transmission System
4.3.2. Jawa-Bali Region Transmission System
4.3.3. Eastern Indonesia Transmission System
V. ELECTRIC POWER DEMAND
5.1. INDONESIA ECONOMIC GROWTH
5.2. INDONESIA POPULATION GROWTH
5.3. AMOUNT OF HOUSEHOLD
5.4. ELECTRIFICATION RATIO
5.5. ELECTRIC POWER DEMAND
VI. DEVELOPMENT OF 35,000 GW POWER PLANT
6.1. ADDITION OF POWER PLANT CAPACITY
6.1.1. Addition of Power Plant by Type in Sumatera Region
6.1.2. Addition of Power Plant by Type in Jawa-Bali Region
6.1.3. Addition of Power Plant in Eastern Indonesia Region
6.2. ADDITION OF TRANSMISSION NETWORK AND RELAY STATION
6.3. DISTRIBUTION SYSTEM AND RELAY STATION DEVELOPMENT
6.3.1. Sumatera Region Distribution System Development
6.3.2. Jawa-Bali Region Distribution System Development
6.3.3. Eastern Indonesian Region Distribution System Development
6.4. DEVELOPMENT OF DISTRIBUTION SYSTEM
6.4.1. Sumatera Region Distribution System Development
6.4.2. Jawa-Bali Region Distribution System Development
6.4.3. Eastern Indonesia Distribution System Development
VII. DEMAND & SUPPLY OF ELECTRIC POWER BY PROVICES (34 Provinces)
Each Provice Shows :
- Recent Electricity Condition
- Projection on Electric Power Demand
- Development of Electricity Utility
- Summary
VIII. INVESTMENT FUND REQUIREMENT
8.1. Projection on Investment Fund Requirement in Sumatera
8.2. Projection on Investiment Fund Requirement in JAWA-BALI
8.3. Projection on Investment Fund Requirement in Eastern Indonesia
IX. CONCLUSION
ATTACHMENT
- LIST OF ELECTRIC POWER (CAPTIVE POWER)
Power Plant Setted up by Owner
(by industry and commercial customers)
- INDEPENDENT POWER PRODUCER (IPP)
Out of P.T. PLN (Persero) Business Area
- LIST OF IPP ENTHUSIAST ON THE MOUTH OF MINE
- LIST OF DEVELOPER THAT SUBMITTED PROPOSAL
ON STEAM POWER PLANT ON THE MOUTH OF MINE
このレポートの関連情報やさらに詳しい情報についての調査を検討したい
矢野経済研究所では、
個別のクライアント様からの調査も承っております
マーケティングや経営課題の抽出、リサーチの企画設計・実施、調査結果に基づく具体的な戦略立案・実行支援に至るまで、課題解決に向けた全ての段階において、クライアント企業をトータルでサポート致します。